Dewatering and water treatment to support the 30,000 square foot mass excavation for the 2.6 million square foot integrated resort casino in Everett, MA.
DEWATERING
- 500 GPM (gallons per minute) Thirteen (13) Deep Wells installed to lower the water table inside of the excavation
WATER TREATMENT
- Two (2) 500 GPM water treatment systems
- Contaminants of concern include ; total suspended solids (TSS), volatile organic compounds (VOCs), semi-volatile organic compounds (SVOCs), cyanide, metals.
- System included; weir tanks, bag filtration, liquid carbon filtration, cation and anion resin, chemical aided settling, aeration and pH adjustment