Binghamton Project

Completed

LRT designed, installed and assisted with the O&M of a 500 gpm capacity water treatment system. The system consistently reduced concentrations of LNAPL, TSS, VOCs, SVOCs, dissolved metals and cyanide such that the water could be discharged to an adjacent river under a New York SPDES Permit. The treatment system was supplied as fully winterized.

remediation-img-2