Connecticut Natural Gas

Liquefaction Upgrade

Dewatering to support a 25 ft. X 30 ft. Excavation for liquefaction infrastructure upgrades.

DEWATERING

  • 60 GPM (gallons per minute) Wellpoint System with 14 wellpoints.
  • Automated controls to remotely monitor; temperature, tank levels, power and flow rate